SWL2820 Operator’s Manual
48
3) Lower the bucket and move reverse
and dump the material to where you
desire.
4.9 DIGGING
Wrong digging operation will damage the machine. Carry
out the follows steps and correct digging method while
digging.
1) At the beginning of work, always
adjust the bucket angle to the correct
digging direction.
2) Once the bucket front edge reaches the
depth, move forward and start filling.
3) To increase the efficiency, you have to
adjust the position of bucket and boom
combined while filling.
4) The digging depth must be suitable for
the machine. Different type ground will affect the available digging depth. An
excessive digging depth may cause locking of the movement even stopping of
the engine.
4.10 LEVELLING UP
After loading or digging, sometimes it is needed to level
up the ground. The machine can use the bucket to level
up the ground. Carry out the following steps:
1) Incline the bucket forward;
2) Lower the boom till the front wheel
raised slightly;
3) Move the machine reverse and
distribute the material uniformly.
WRONG
RIGHT