SWL2820 Operator’s Manual
63
5.4.3 ELECTRICAL SYSTEM
Never wet any of the electric components, since the wet electric components could result
damaged.
Never remove any electric component installed and install any other component with
different characteristics.。
If any welding operation has to be carried out, disconnect the battery and the alternator.
5.4.4 SAFETY BELT
Change the seat belt every 4 years.
Check the situation of seat belt frequently.
5.5 MAINTENANCE PLAN
A maintenance plan has been described in this manual in order to maintain the efficiency of the
machine and his parts. It is recommendable to follow this plan. Be aware of the working hours
by reading the hour meter.
Write down all the maintenance assistance done to the machine in order to do a proper
maintenance plan. The maintenance has to carry out by authorized and qualified persons.
The following table summarizes the entire maintenance plan.
TASKS BS 50 100 250 500 1000 2000 WR
5.5.1.1 CHECKING ENGINE OIL
LEVEL
X
5.5.1.2 CHECKING ENGINE
COOLANT LEVEL
X
5.5.1.3 CHECKING FUEL LEVEL
X
5.5.1.4 CHECKING HYDRAULIC OIL
LEVEL
X
5.5.1.5 CHECKING THE ELECTRIC
CABLES
X
5.5.1.6 CHECKING THE TIRES
X
5.5.1.7 CHECKING THE SEAT BELT
X
5.5.1.8 CHECKING THE LEAKING OF
OIL
X
5.5.1.9 CHECKING THE QUICK
COUPLER
X
5.5.1.10 CHECKING THE WATER
AND SEDIMENTS SEPARATOR
X
5.5.2.1 CHECKING THE COOLER
PIPES
X