EasyManua.ls Logo

Supermicro A+ Server 2123BT-HTR - Page 31

Supermicro A+ Server 2123BT-HTR
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Chapter 3: Maintenance and Component Installation
10. Secure the screws in the order 1-2-3, tightening each to 16.1 kgf-cm (14 lbf-in) of
torque using a Torx T20 driver. The Force Frame secures both the Rail Frame and CPU
Package.
Caution: The screw tightening sequence of 1-2-3 must be executed in the proper sequence
to avoid catasrophic damage to the socket or CPU package.
Figure 3-12. The Force Frame Secured
Figure 3-11. Securing the Force Frame
Screw 1
Screw 3
Screw 2

Table of Contents