ELECTRICAL SYSTEM 9-27
CKP SENSOR PEAK VOLTAGE
NOTE:
Be sure that all couplers are connected properly and the battery
used is in fully-charged condition.
Lift and support the fuel tank. (5-3)
Disconnect the CKP sensor lead wire coupler and connect
the multi-circuit tester with the peak volt adaptor as follows.
B wire ( Probe) – G wire ( Probe)
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
Shift the transmission into the neutral and turn the ignition
switch ON.
Crank the engine a few seconds with the starter motor by
depressing starter button and check the CKP sensor peak
voltage at the CKP sensor coupler.
Repeat the above test procedure a few times and measure
the highest peak voltage.
Measure the CKP sensor peak voltage at the ECM coupler
( and terminals). (4-39)
Tester knob indication: Voltage ()
CKP sensor peak voltage: 0.5 V and more (G – B)
If the peak voltage is lower than the standard range, check the
coupler connection or replace the CKP sensor and inspect it
again.
CKP SENSOR RESISTANCE
Measure the resistance between the lead wires and ground. If
the resistance is not as specified, the CKP sensor must be
replaced.
09900-25008: Multi-circuit tester set
Tester knob indication: Resistance (Ω)
CKP sensor resistance:142 – 194 Ω (G – B)
∞Ω (G – Ground)
Before using the multi-circuit tester and peak volt
adaptor, be sure to refer to the appropriate instruction
manual.
CKP sensor
Peak
volt
adaptor
CKP sensor
coupler
G
B
G
B
CKP sensor
CKP sensor
coupler

Table of Contents