56 A-96.250.531 / 300617
AMI Oxytrace QED
Maintenance
6.8.5 Completion of the measurement
1 Stop the sample flow to the AMI Oxytrace QED by closing the
appropriate valve, e.g. back pressure regulator, sample prepa-
ration or flow regulating valve at flow cell again.
2 Close flow regulating valve of the AMI Inspector.
3 Disconnect the AMI Inspector by removing the tubes and con-
nect the sample outlet of the Monitor AMI Oxytrace QED to the
sample outlet funnel again.
4 Start sample flow again and regulate sample flow.
5 Shutdown the AMI INSPECTOR Oxygen.
If the AMI Inspector is put out of operation for a longer period of
time, see Longer Stop of Operation, p. 58.