AMI Oxytrace QED
Program List and Explanations
A-96.250.531 / 300617 71
3 Maintenance
3.1 Calibration
3.1.1 Start a calibration and follow the instructions on the screen. Dis-
played values are saturation in % and the saturation current in mA.
The indication bar shows the progress. Detailed explanation see
Calibration, p. 47.
3.2 Service
3.2.1 Electrolyte
Last Filling: Shows the date of the last filling of electrolyte.
Remaining Amount: Remaining amount of electrolyte in %.
Remaining Time: Remaining time in days until electrolyte
exchange
recommended.
3.2.1.5 New Filling: Select “Yes” after electrolyte exchange to reset the
counter.
3.2.2 Faraday Verification
Start a manual faraday verification. Displayed values are current
value in ppb and the faraday concentration in %.
Current value: Measuring value in ppb
Faraday conc.: Oxygen concentration in % after activating the
faraday verification.
Progress: The progress bar shows the progress of the faraday
verification.