TAC 2112, Manual Commissioning Protocol / List of Parameters
TAC AB, 1999-08-01 0-004-7459-3 (GB), A:1(6)
Appendix A, Commissioning Protocol / List of Parameters
This protocol is to be used when commissioning the TAC 2112 controller. Note your settings in the
column marked “Change”. How to read off and set parameters is described in Chapter 3, “Using the
operator’s panel”. The commissioning protocol may be copied.
Changeover switch
off on off on Default Change
1 Outdoor sensor connected directly Outdoor sensor from other
TAC 2000
off
2 No reference sensor Reference sensor connected off
3 – –
4 – –
5 – –
6 – –
7 – –
8 Normal operation Resetting controller
off
P No. Parameter Min. Max. Step Default Change Comments
P 00 Current time 00:00 23:59 00:01
P 01 Outdoor temperature –30 °C 45 °C 0,3 °C
Step=0,1 at 2–40 °C
P 02 Damped outdoor temp. –30 °C 40 °C 0,1 °C
P 03 Supply temperature 0 °C 120 °C 0,3 °C
Step=0,1 at 2–55 °C
P 04 Calc. setpoint supply temp. 0 °C 120 °C 0,1 °C
P 05 Curve shift –40 °C 40 °C 0,5 °C 0 °C Without ref. sensor only
P 06 Night setback –40 °C 40 °C 0,5 °C –10 °C Without ref. sensor only
P 07 Room temperature 0 °C 45 °C 0,1 °C
With ref. sensor only
P 08 Calc. setpoint room temp. –35 °C 70 °C 0,1 °C
With ref. sensor only
P 09 Room setpoint, day 5 °C 30 °C 0,5 °C 21 °C With ref. sensor only
P 10 Room setpoint, night 5 °C 30 °C 0,5 °C 18 °C With ref. sensor only
P 11
P 12
P 13 Return temp., heating 0 °C 120 °C 0,3 °C
Step=0,1 at 2–55 °C
P 14 Weekly prog. for heating - - 0,5 h 06-22 see below ! = daytime operation
Daytime operation, heating MO TU WE TH FR SA SU
off:
on:
off:
on:
Date Commissioned by Unit designation
Installation name Order number
Drawing number