EasyManua.ls Logo

TCL TCA-60HRA/DV3O - Page 20

TCL TCA-60HRA/DV3O
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC Inverter Air
Drainage Upward
To make sure that the drainage pipe would not be slanteddownward, lead it upward to a
height 360mmmaximum,then downward lead it.
Drainage Test
Check whet her the drain pipe is unhindered before testing.
1) Stow water from sprue to check.
2) Stow 600cc water with pot or hose from sprueslowly , preventing touchng the drain pump motor.
3)
After the preparation work , disconnect the water level switch ,power 20‐240VAC to of terminal board,
and the drain pump start up immediately.
4)
After drain pump run 2 min.,reset he water level pin, and t e drain pump motor will stop after running 1
min..
20/ 113

Table of Contents

Related product manuals