EasyManua.ls Logo

TestEquity 1007C - Chapter 6 - Purge; Introduction; GN2 (Gaseous Nitrogen) Installation (Option TE-0031); Dry Air Installation (Option TE-0034)

TestEquity 1007C
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6 – Purge
TestEquity 1007C Temperature Chamber Page 6-1
Chapter 6 – Purge
Introduction
Optional GN
2
(gaseous nitrogen) Purge or optional Dry Air Purge can be used to reduce to
possibility of condensation in the chamber at low temperatures.
! CAUTION: Nitrogen cannot be detected by human senses. Nitrogen is non-toxic.
However, if adequate ventilation is not provided, nitrogen will displace air.
This can cause dizziness, unconsciousness or death without warning. The
chamber must be located in a well-ventilated area. Do not open the chamber
door with the GN
2
flowing.
GN2 (Gaseous Nitrogen) Installation (Option TE-0031)
Connect a supply of GN
2
with a maximum pressure of 100 psig to the 1/4-inch FPT fitting which
is designated PURGE on the rear panel.
Dry Air Installation (Option TE-0034)
Option TE-0031 is a prerequisite to provide the purge inlet functionality for Option TE-0034.
Connect the hose from the Dry Air
system to the fitting which is designated PURGE on the rear
panel. Connect a supply of compressed air to the 3/8-inch FPT shutoff valve of Dry Air system.
Connect the power cord from the Dry Air system to the DRY AIR POWER socket on the rear
panel. This plug must be twisted clockwise to lock it. The Dry Air system requires 8 cfm of
compressed air at 100 psig (175 psig max).

Table of Contents

Related product manuals