EasyManua.ls Logo

Teze TW-EOR48 - Installation Procedures; Inspection of Outer Package; Inspection of Deliverables

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
10
3. Inspections before Installation
3.1 Inspection of outer package
Before opening outer package of the all-in-one machine, check if there is any visible damage on the
outer package, such as holes, cracks or other signs of possible internal damage, and check the type of
all-in-one machine. If there is any abnormality on the package or model of the all-in-one machine is
inconsistent, do not open it and contact us as soon as possible.
3.2 Inspection of deliverables
After opening outer package of the all-in-one machine, check if the deliverable is complete and
whether there is any visible external damage. If any items are missing or damaged, please contact us.
No.
Picture
Quantity
Specification
1
1
2
2
SC70-10/cold-pressed terminal
head thickened wire terminal
3
2
Connect AC power
4
2
Solar panel connecting wire
terminal
5
1
6
1