Add: Building A, Xinlida Industrial Park, Junzibu Village,Guanlan Street, Longhua District ,Shenzhen,
Guangdong
TEL :0755-23225527 FAX:0755-23225537
3.3 Preparation of Tools and Meters
4. Installation
4.1 Select the mount location
TEZE-AO series are designed for INDOOR USE ONLY (IP20). Please consider the followings before
selecting the location.
• Adequate heat dissipation space must be provided for the product.
• The ambient temperature should be between-10~55℃ (14~131℉) to ensure optimal operation.
• Do not install the inverter where highly flammable materials are near by.
• Do not install the inverter in potential explosive areas.
• Do not install the inverter with lead-acid batteries in a confined space.
• Do not install the inverter in direct sunlight.
• Do not install or use the inverter in a humid environment.