EasyManua.ls Logo

ThyssenKrupp NBS - Page 35

ThyssenKrupp NBS
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING MANUAL NBS TECHNOLOGY
ThyssenKrupp Aufzugswerke GmbH
Note: if you want to extend the supplied connections or use your own cables,
ensure these have an adequate cross-section in order to prevent voltage
drops between the power source and brake.
Make sure that the supply voltage is correct. Undervoltage reduces the
maximum possible air gap and therefore leads to wear or malfunctions in the
emergency brake.
Connection to third-party control systems
When connecting the NBS emergency brake to a control system that was not
supplied by ThyssenKrupp Aufzugswerke, the regulations of the type
approval in the Appendix (see chapter 8) must be complied with.
ThyssenKrupp Aufzugswerke GmbH shall not be liable in this case
35
10-2012

Related product manuals