Document Ref 947571-001 Rev 2 Page 5-9
Quantium 110 & 210 Installation Manual Installation
1) Place the terminal earth clamp over the supply riser
pipe and tighten.
Add the threaded flange and O-ring OD49.
2) Place the elbow of the flexi pipe through
the hole of the flange. Connect to the
threaded flange resting on the supply
riser pipe using 3 M8x30 screws.
3) Tighten the screws on the terminal earth clamp and the
2 flanges.
4) Place the elbow of the flexi pipe through the
hole of the junction flange, then add the O-
ring OD37. Bend the flexi pipe until the
junction flange mates with the pump inlet.
5) Tighten the screws from the junction flange to the
pump inlet.
6) Repeat steps 1 to 5 for each hydraulic position as
required.