Page 5-16 Document Ref 947571-001 Rev 2
Installation Quantium 110 & 210 Installation Manual
5.6.2 JUNCTION BOX WIRING
1) Follow the instructions given in section 4.6 to access the hydraulic area. Locate
the relevant Junction Box in the hydraulic area.
2) Remove the four screws on the junction box cover
and remove completely.
3) Locate the relevant terminal rail inside the relevant
junction box.
4) Make the connections according to the correct wiring
diagram shown in this section.
IMPORTANT :- ENSURE THE CORRECT
WIRING DIAGRAM IS FOLLOWED.
5) When complete, re-fit the junction box cover.
6) Ensure that all tools and unused materials are
removed, close the hydraulic door and lock.
7) Re-instate power to the dispenser and test its operation.
Junction Box - Single Phase Suction
1 PH MOTOR & CALC
(3x2.5mm² or MICC)
1 2 3 4 5 6 7 8
* Note 1
16A dispenser circuit breaker
for models with 2 x EPZ :
Q200T 2-2 models
10A dispenser circuit breaker
for all other models
TERMINALS IN
JUNCTION BOX
FORECOURT
WIRING
KIOSK
EQUIPMENT
PE L N
Dispenser MCB
* Note 1
TERMINALS IN CA150
BERNSTEIN JUNCTION BOX