Page 5-8 Document Ref 947571-001 Rev 2
Installation Quantium 110 & 210 Installation Manual
5.5 Hydraulic Connections
Connect all hydraulic and electric junctions according to the specifications as described
in this section and indicated on the drawings in Section 3.
Flow rates achieved are dependent upon the type of submerged pumping system used and
other site-specific conditions.
Note : The maximum pressure must not exceed 3.5 bar.
5.5.1 PIPEWORK - SUCTION DISPENSERS WITH INTERNAL FILTER
Connections to the fuel supply pipes and the vapour return lines are accessible
from side A of the dispenser (see section 5.2 for identification of sides).
TQP PUMPS WITH INTERNAL FILTER
M8 Self Lock Nut
Terminal Earth Clamp
Threaded Flange
O-Ring OD49, 00x6.00
O-Ring OD37, 47x5.33
Flange
Screw HFHS M8x30
Screw HFHS M8x25
Flexi Pipe EPZ
Junction Flange

Table of Contents