EasyManua.ls Logo

Topcon RL-HV Series - Page 31

Topcon RL-HV Series
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
7. APPLIED OPERATIONON
3. Horizontally rotate the laser beam of the RL-HV. (1S: X+0.000% /
2S: X+0.000%, Y+0.000%)
4. At Point B adjust the height of the LS-80X installed on a pole, align
the standard position of the LS-80X with the laser beam and fix.
5. Set the RL-HV at X+3.000% grade (1S) / at X+0.000% and Y-
3.000% grades (2S).
6. Align the RL-HV direction on top of the tripod so as to have the
laser beam in the ongrade position of the LS-80X in step 4.
Do not change the height of the LS-80X installed on the pole.
If the height of the RL-HV is changed, return to step 3 and redo the adjustment.

Related product manuals