Setup
MediaandAdditionalParts
Description
Qty.
Use
Operator'sManual
1
Readbeforeoperatingthemachine.
Key2
Startthemachine.
1
CheckingTireAirPressure
NoPartsRequired
Procedure
Checktheairpressureinthedrivetires,andadjust
thepressureasneeded;refertoCheckingtheAir
PressureintheTires(page46).
Note:Youdonotadjustairpressureforthe
semi-pneumaticcastertires.
2
ServicingtheBattery
NoPartsRequired
Procedure
Note:Themachineisshippedwithalled,lead-acid
battery.
1.MovethekeyswitchtotheOFFpositionand
removethekey.
2.Measurethevoltageofthebatterywitha
voltmeter.
3.Usethetablethatfollowstolocatethe
chargestateorthebattery,andifneeded,the
battery-chargersettingandcharginginterval
recommendedtochargethebatteryto12.6Vor
greater;refertothebatterychargetablebelow.
Important:Makesurethatthenegative
batterycableisdisconnected,andthe
batterychargerusedforchargingthebattery
hasanoutputof16Vand7Aorlessto
avoiddamagingthebattery(seechartfor
recommendedchargersettings).
BatteryChargeTable
Voltage
Reading
Percent
Charge
Maximum
Charger
Settings
Charging
Interval
16V/
12.6or
greater
100%
7A
Nocharging
required
16V/
12.4to12.6
75to100%
7A
30minutes
16V/
12.2to12.4
50to75%
7A
1hour
14.4V/
12.0to12.2
25to50%
4A
2hours
14.4V/
11.7to12.0
0to25%
4A
3hours
14.4V/
11.7orless
0%
2A
6hoursor
more
4.Ifthepositivecableisalsodisconnected,
connectthepositive(red)cabletothepositive
batteryterminalandsliptheterminalcoverover
thepositiveterminal.
5.Removethescrew,washer,andgroundcable
fromtheengine.Connectthenegativebattery
cableasshowninFigure4.
9