ConnectingtheRate-GateLinkage
1.Pullthelinkageoutuntilitclearsthedrop-rate
cam(Figure30).
2.Movethewide-distributionimpeller-gatelever
forward.
3.Attachingthecabletotheballstudatthegate
lever(Figure30).
AssemblingtheImpeller
1.Assembleimpellerontotheimpellershaftand
securetheimpellerwiththedrivepin.
2.Aligntheholesinthefrontcoverwiththeclip
nutsinthechassisandsecurethecoverwith
the4thumbscrewsthatyouremovedinstep3
ofRemovingtheImpeller(page27).
29