OPERATION
Trace Engineering Co. Inc. Tel (360) 435-8826 Part Number 3179
5916 195
th
Street, NE Fax (360) 435-2229 Effective August 6, 1998
Arlington, WA 98223 USA www.traceengineering.com Page
39
4. Disconnect shore power. Take away the shore power by turning the shore power breaker off, or
unplugging the shore power. The inverter should transfer to inverter mode immediately. This will
be indicated by a clicking sound as the internal transfer relays change position. The inverter will
begin to buzzas it takes power from the batteries and uses it to power the loads. The loads
should continue to operate uninterrupted.
The above steps will complete a functional test of the inverter. If all areas pass, the inverter is ready
for use. If any area fails, figure out why before proceeding. The troubleshooting guide in Appendix
A: Troubleshooting will help you solve problems you encounter. If any of the inverters internal
setpoints are to be adjusted, consult the booklet included with the RC7 remote control.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trace Engineering Legend and is the answer not in the manual?

Trace Engineering Legend Specifications

General IconGeneral
BrandTrace Engineering
ModelLegend
CategoryInverter
LanguageEnglish

Related product manuals