EasyManuals Logo

Triton Safeguard User Manual

Triton Safeguard
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
11
WARNING!
Before normal
operation of the
shower, it is essential
the commissioning
procedure is completed
correctly.
When the start/stop bar is
pressed water will continue
to flow in order to remove
heated water inside the
unit (see phased shutdown
process). Water will cease to
flow after a few seconds.
After phased shutdown the
unit must be isolated via the
45amp-isolating switch.
Note: It is advisable to be
certain that the showering
temperature is satisfactory
by testing with your hand
before stepping under the
showerhead. There will
always be a time delay of
a few seconds between
selecting a flow rate and
the water reaching the
stable temperature for
that flow rate.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Triton Safeguard and is the answer not in the manual?

Triton Safeguard Specifications

General IconGeneral
TypeElectric Shower
MaterialPlastic
ColorWhite
InstallationWall Mounted
Cable Entry PointsBottom
Dimensions200 x 200 x 90 mm

Related product manuals