EasyManua.ls Logo

turck DR Series - Commissioning; Activating IO-Link mode; Activating SIO mode

turck DR Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
V01.00 | 2021/11
17
7 Commissioning
After connecting and switching on the power supply, the device is automatically ready for op-
eration.
The analog and switching outputs have a 300 ms readiness delay.
7.1 Activating IO-Link mode
NOTE
The voltage range in IO-Link mode is 18…30 VDC.
Set a cycle time of min. 2.3 ms on the IO-Link master.
a The device is operational. After a readiness delay of 450 ms, the process data can be sent
to the IO-Link master.
7.2 Activating SIO mode
Connect the device to a standard I/O port or an analog port.
a The device is operational after a readiness delay of 500 ms.
The readiness delay in SIO mode is required to operate preactivated sensors so that the sensor
can exclude being connected to an IO-Link master. The readiness delay does not have an effect
on any potential IO-Link communication.

Related product manuals