EasyManua.ls Logo

United Parachute Technologies Vector 3 - Placing the Bag in the Reserve Container (with Staging Loop & Skyhook)

Default Icon
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VECTOR3MANUAL
MAN‐004REV7.2327/20/2017
PLACING THE BAG IN THE RESERVE CONTAINER
(
WITH OPTIONAL STAGING LOOP & SKYHOOK)
*FORPROCEDUREWITHOUTSTAGINGLOOPAND
SKYHOOK,SEEPAGE38.
1.Placethebaggedcanopyonthemaincontainer
andpositionthereserverisersinthereservepack
tray.Fanthelinksratherthanstackingthemon
eachother,placingtherearlinkstotheoutside.Be
suretoplace
thereserverisersfarenoughinthe
packtraysotheywilllieflatovertheshoulders.
2.Passapull‐upcordthroughthereserveclosing
loopandasecondpull‐upcordthroughtheshock
cordstagingloopasshown.
NOTE:
Thepre‐stretchedreserveclosingloopwill
measure4½”+/‐½”.
Colorcodedpull‐upcordsarehelpful.
NOTE:
Regardlessofthelooplength,thestagingloopwill
alwaysbe1”shorterthantheCypresloop.This
ensurespropertensiononthereservebridleforall
V3models.
3.Passbothpull‐upcordsthrough
thebodkinand
pullthroughtothetopside.
1”
NOTE
If a T‐bar was passed through the bag,
threadtheendsof the pull‐up cordthrough
theholeintheendoftheT‐bar.
RemovetheT‐barfrom the bagged canopy,
pulling the closing loop and pull‐up cord
throughit.

Table of Contents