EasyManua.ls Logo

United Parachute Technologies Vector 3 - User Manual

Default Icon
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
VECTOR3MANUAL
MAN004REV7.2i7/20/2017


Table of Contents

Question and Answer IconNeed help?

Do you have a question about the United Parachute Technologies Vector 3 and is the answer not in the manual?

Summary

Section 1: Introduction

Before Jumping Your Vector 3

Provides essential pre-jump considerations and warnings for users of the Vector 3 system.

Section 2: Reserve Assembly Procedures

Installing Automatic Activation Devices (AAD)

Guides the user on installing an AAD into the Vector 3 harness and container system.

Section 3: Reserve Packing Instructions

Inspection

Outlines the essential inspection steps for the reserve parachute and its system components.

Packing the Reserve Canopy

Guides the user through the flaking, folding, and stacking of the reserve canopy using the Pro Pack method.

Section 4: Main Canopy Assembly and Packing Procedures

Attaching the Main Canopy to the Main Risers

Details how to inspect and attach the main canopy to the main risers.

Attaching the Main Steering Toggles

Explains the procedure for attaching main canopy steering toggles, noting line type differences.

Attaching the Collapsible Pilot Chute

Guides the user on attaching the main deployment bag and pilot chute to the canopy bridle.

Preparing the Main Pilot Chute

Describes how to cock the main pilot chute for correct deployment function.

Setting Up the Pull-Out Deployment System

Details the setup of the bridle and pin for a pull-out main deployment system.

Closing the Main Container

Provides step-by-step instructions for closing the main container after packing the deployment bag.

Section 5: The Booth 3-Ring Release System

Assembly

Provides instructions for assembling the Booth 3-Ring release system components.

Pre-Jump Inspection

Details the critical pre-jump checks for the Booth 3-Ring release system.

Section 6: Maintenance & Care

Inspecting Your Vector 3

Recommends detailed rig inspections, including specific areas like the cutaway and reserve systems.

Section 7: How to Use the Vector 3

Pre-Jump Equipment Check

Provides a logical, top-to-bottom check sequence for the parachute equipment before a jump.

Donning and Adjusting the Vector 3

Guides the user on properly putting on and adjusting the Vector 3 harness for a snug and comfortable fit.

United Parachute Technologies Vector 3 Specifications

General IconGeneral
BrandUnited Parachute Technologies
ModelVector 3
CategoryAccessories
LanguageEnglish