EasyManuals Logo

Upright NX15 User Manual

Upright NX15
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
Page 16 113100-020 - MX15 / MX19 - Operation Manual
Inspection and Maintenance Schedule
I
NSPECTION
AND
M
AINTENANCE
S
CHEDULE
The Complete Inspection consists of periodic visual and operational checks, along with periodic minor
adjustments that assure proper performance. Daily inspection will prevent abnormal wear and prolong the
life of all systems. The inspection and maintenance schedule should be performed at the specified inter-
vals. Inspection and maintenance shall be performed by personnel who are trained and familiar with
mechanical and electrical procedures.
WARNING
!
!
Before performing preventative maintenance, familiarize yourself with the operation of the machine.
Always block the elevating assembly whenever it is necessary to perform maintenance while the
platform is elevated.
The daily preventative maintenance checklist has been designed for machine service and maintenance.
Please photocopy the Daily Preventative Maintenance Checklist and use the checklist when inspecting the
machine.

Table of Contents

Other manuals for Upright NX15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Upright NX15 and is the answer not in the manual?

Upright NX15 Specifications

General IconGeneral
BrandUpright
ModelNX15
CategoryLifting Systems
LanguageEnglish

Related product manuals