6. The test mode will end automatically after one hour. You can select a longer timeout from
the drop-down menu marked Test mode timeout in. Select Update to take the new
timeout into use.
7. Start testing by reading information from the DGA monitor from the SCADA system side.
8. When you are done testing, select Close to end the test mode immediately or wait until
the end of the timeout.
More information
‣
Protocol test mode (page 27)
‣
Connecting to user interface (page 30)
3.16 Configuring relays
Figure 38 Relay settings page
1. Connect to the user interface as the Admin user.
2. In the user interface, select Settings > Relays.
Chapter 3 – User interface
63