CONTENTS (Continued)
Section Heading Page
10. BURNER AND SUPPLY PIPE INSTALLATION 31
10.1 Burner and supply pipe installation. 31
10.2 Preliminary burner checks. 31
10.3 Inlet pressure check. 32
11. CERAMIC WALLS INSTALLATION 32
12. FASCIA AND CONTROL LINKAGE 33
13. FITTING THE CERAMIC FUEL EFFECT 37
14. FIREFRONT / BOTTOM COVER INSTALLATION 37
15. FULL OPERATING CHECKS 38
15.1 Checking the control settings. 38
15.2 Check for spillage. 39
15.3 Flame supervision and spillage monitoring system. 40
16. FINAL REVIEW 41
17. SERVICING & PARTS REPLACEMENT 42
17.1 Checking the aeration setting of the burner. 43
17.2 To remove the ignition microswitch. 43
17.3 To remove the gas shut-off microswitch. 43
17.4 To remove the fascia. 44
17.5 To replace the control slide unit. 45
17.6 To replace the control slide button. 46
17.7 To remove the complete burner unit. 46
17.8 To remove the electronic ignition generator. 47
17.9 To remove the thermocouple interrupter block. 47
17.10 To remove the pilot unit. 48
17.11 To remove the shut-off tap. 48
17.12 To remove the gas flow rate controller. 49
17.13 To replace the burner. 49
17.14 To remove the main burner injector. 50
17.15 To remove the appliance from the fireplace. 50
Page 6
© Baxi Heating U.K. Limited 2009.
INSTALLER GUIDE