5. Installing the Equipment: Wall Mount
vatech A9 (Model: PHT-30CSS) Installation Manual 71
3. Place the equipment over the Alignment Plate to insert each Anchor Bolt into a
corresponding hole on the Column Bottom.
4. Place the washers and nuts on Anchor Bolts. Tighten each nut loosely with a
fastener.
DO NOT tighten the nuts until the leveling is completed.
While one installer tightens the nuts, the other installers
should hold the middle handle to prevent the equipment
from falling.