EasyManua.ls Logo

Veeder-Root TLS-HLD - Replacing the CPU Board

Veeder-Root TLS-HLD
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
Troubleshooting Probe Diagnostic Report
Probe Diagnostic Report
The Diagnostic Report example below is a printout of probe information, for all tanks. The probe functions are discussed
in Table 1.
DIAGNOSTICS
SOFTWARE VERSION 349
TANK : 1 2 3
PROBE TYPE : GLB8 GLB8 GLB8
SERIAL NUMBER : 123001 123002 123003
PROBE ID : D021 D021 D021
PROBE LENGTH : 96.0 96.0 96.0
GRADIENT : 350.00 350.00 350.00
NUMBER SAMPLES : 20 20 20
SAMPLES READ : xxxxxx xxxxxx xxxxxx
SAMPLES USED : xxxxxx xxxxxx xxxxxx
COUNTS 00 : xxxxx xxxxx xxxxx
01 : xxxxx xxxxx xxxxx
02 : xxxxx xxxxx xxxxx
03 : xxxxx xxxxx xxxxx
04 : xxxxx xxxxx xxxxx
05 : xxxxx xxxxx xxxxx
06 : xxxxx xxxxx xxxxx
07 : xxxxx xxxxx xxxxx
08 : xxxxx xxxxx xxxxx
09 : xxxxx xxxxx xxxxx
10 : xxxxx xxxxx xxxxx
11 : xxxxx xxxxx xxxxx
12 : xxxxx xxxxx xxxxx
13 : xxxxx xxxxx xxxxx
14 : xxxxx xxxxx xxxxx
15 : xxxxx xxxxx xxxxx
16 : xxxxx xxxxx xxxxx
17 : xxxxx xxxxx xxxxx
18 : xxxxx xxxxx xxxxx
19 : 0xhhhh 0xhhhh 0xhhhh
Replacing the CPU Board
The CPU board in the TLS-HLD must be replaced when:
A system self-test failure occurs during a warm or cold boot, or
The display contains garbled messages and/or the voltage between the GND and 8V test points on the back of the
CPU board is within 7 - 9 Vdc; or,
The voltage between the GND and 5V test points [Figure 19] on the back of the CPU board is not within 4.75 - 5.25
Vdc.
1. Turn Off power to the system.
OFF

Table of Contents

Related product manuals