Table of Contents
Section 1 - BASIC OPERATION 1
Buttons 1
Display 2
Dimming control 2
Tachometer Operation 2
Manifold Pressure Operation 3
Percent Power Operation / Calibration 4
Oil System Operation 4
Fuel Computer System Operation 5
Cylinder Watch System Operation 7
EGT Analyzer System Operation 8
Peaking Mode Operation 9
Electrical Monitoring System Operation 10
Autotrack™ System Operation 10
Flight Data Recorder System Operation 12
Air Temperature System Operation 15
Fuel Level System Operation (Optional) 15
Turbo Inlet Temperature System Operation 16
Section 2 - EC100 SYSTEM OPERATION (Optional) 16
Section 3 - INSTALLATION 20
Indicator Installation 20
EC100 System Installation (Optional) 20
Routing the Wiring Harnesses 22
Power Connection 24
Probe and Transducer List 24
Probe Wiring 25
Wiring Markings 26
Exhaust Gas Temperature Probe (EGT) Installation 26
Turbine Inlet Temperature (TIT) Probe Installation (Optional) 27
Cylinder Head Temperature (CHT) Probe Installation 27
Outside Air Temperature (OAT) Probe Installation 28
Induction Air, CDT Probe Installation (Optional) 28
Carburetor (CAT) Probe Installation (Optional) 29
Oil Temperature Probe Installation 29
Oil Pressure Sensor Installation 30
Fuel Pressure Sensor Installation 30
RPM Sensor installation 31
Ammeter Shunt Installation 31
Capacitive Fuel Level Sender Installation 32
Resistive Fuel Level Sender Installation 35