!
Warning
Replacement of Coolant
· Discharge Coolant:
-Keep the motorcycle upright with dedicated parking
racks.
-Place a tray under the engine.
-Remove drain bolts. All coolant will be discharged
from the port as the whole heat dissipation system is
interlinked.
-Install the drain bolts back.
· Fill coolant:
-Coolant is required to be filled from both the radiator and
expansion tank.
-Open the tank cover (as shown in Figure 2) and add coolant
-Observe the coolant level and pinch the water pipe to inject water and exhaust air while until it is full,
and then cover the radiator tank.
-After covering the radiator tank, start the engine for 30s to ensure coolant fills all parts that need
cooling.
-Turn off the engine and open the radiator tank again after it is cooled down. Check whether the
coolant is full. If not, fill it full. Cover the radiator tank and repeat the process until it is full. Sometimes
twice is necessary.
-Finally, remove the black rubber cover of the expansion tank (as shown in Figure 3) and add coolant
between the specified LOWER and UPPER level.
Drain bolt
Water injection port
The cooling system will be damaged by tap water which is prohibited. Due to different
formulations, different types of coolant are not compatible.
56