EasyManua.ls Logo

Wacker Neuson EZ26 - Battery Master Switch

Wacker Neuson EZ26
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA EZ26 en/us* 1.0 * EZ26_01_400.fm 4-43
Putting into operation 4
Battery master switch
NOTICE
Possible damage to the electronics due to improper actuation of the
battery master switch.
Do not operate the battery master switch with a running engine.
Operate the battery master switch no sooner than two minutes after
shutting down the engine.
Actuate the battery isolator switch:
If the vehicle is parked for longer periods of time (e.g. over the
weekend).
If the vehicle is to be protected against unintentional taking into
service.
If required by national and regional provisions.
The battery isolator switch is located under the valve hood.
Interrupt the electric power supply:
Flip up the battery isolator switchA and remove from theB positive
terminal.
Establish the electric power supply:
Set the battery isolator switchA to the positive terminalB and fold down.
Fig. 116 (symbolic representation)
A
A B

Table of Contents

Related product manuals