EasyManua.ls Logo

Wacker Neuson EZ26 - Opening the Engine Cover; Fuse Boxes

Wacker Neuson EZ26
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA EZ26 en/us* 1.0 * EZ26_01_700.fm 7-19
Maintenance 7
Opening the engine cover
1. Stop and park the vehicle Stop the engine
-See Preparing lubrication”.
2. Turn the starting key in lock A anticlockwise.
3. Press lock A and open the engine hood.
The engine cover is supported by a gas strut.
Close the engine cover
1. Firmly press down the engine cover.
2. Turn the starting key in lock A clockwise.
Fuse boxes
see chapter “9.8 Electrical system” on page 9-3
Maintenance flap
Behind the maintenance cover to the left on the chassis is the on-board
tool kit.
Unlocking:
Turn the starting key in lock A anticlockwise.
Locking:
Turn the starting key in lock A clockwise.
Fig. 238
A
Fig. 239
A

Table of Contents

Related product manuals