5-36 BA EZ26 en/us* 1.0 * EZ26_01_510.fm
5 Operation
AUX V (option)
Setting grab operation
1. Move both levers A on the ball-type cock to position 2.
➥ Notch C indicates the flow direction.
Stopping bucket operation
1. Move both levers A on the ball-type cock to position 1.
➥ Notch C indicates the flow direction.