EasyManua.ls Logo

Wacker Neuson EZ26 - Page 160

Wacker Neuson EZ26
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-50 BA EZ26 en/us* 1.0 * EZ26_01_510.fm
5 Operation
Setting down an attachment
1. Screw in the attachment and position it at 5–10 cm (2–4 in) above the
ground.
2. Shut off the engine and store the ignition switch key safely.
3. Turn the socket wrench D counter-clockwise until the bolts E are
completely retracted.
The quick coupler system is unlocked.
4. Remove the socket wrench.
5. Start the engine.
6. Lower the attachment to level and firm ground ensuring stability.
7. Retract the bucket cylinder and quick coupler system A from the
attachment bolt B.
Fig. 194
Fig. 195
E
D
Fig. 196
B
A

Table of Contents

Related product manuals