wc_tx003863gb_FM10.fm
72
Operation RT / RTx
Note
Using the second method requires the machine to be running or the keyswitch
to be in the “ON” position.
The Cable Control System will only charge the transmitter battery if the control
cable is connected to the transmitter receptacle (b) and plugged into the port (a)
in the back of the roller.
Charging time
Approximately 2 hours is required to bring the transmitter battery up to full charge.
This is the most efficient way to use the battery. The transmitter will operate with a
partially charged battery; however, its operating time will be reduced accordingly.
Note: The charging circuit in the transmitter is self-regulating and limits the
charging current to the battery, so that the battery cannot be overcharged.