4 Maintenance Procedures
210 January 11, 2016, 715004599 Rev. B
8. Gently pull off the O-ring from around the tube’s fitting and slide the O-ring to the
left.
9. Pull enough of the line being replaced to the right and allow the capillary line to
slide through its channel to remove it.
10. Dispose of the removed tubing in accordance with standard laboratory procedures
for contaminated vessels and sharps.
Installing a fluidic line
Required materials
• Chemical-resistant, powder-free gloves
• Fluid line assembly
To install a fluidic line:
1. Prepare the instrument for working on its source (see page 97).
Warning: To avoid personal contamination with biohazards or toxic
materials, and to avoid spreading contamination to uncontaminated surfaces,
wear clean, chemical-resistant, powder-free gloves while performing this
procedure. The source components can be contaminated.
Warning: To avoid electric shock, prepare the instrument for work performed on
its source before beginning this procedure.