EasyManua.ls Logo

Wega Mininova - 2 Preparation; Unpacking the Machine

Wega Mininova
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Technical manual
ENGLISH
NERO
C:0 M:0 Y:0 K:100
ROSSO
C:0 M:100 Y:100 K:0
VERDE
C:100 M:0 Y:100 K:0
technical
data
plate
2 Preparation
2.1 Unpacking the machine
Open the packaging, ensuring not to damage the
machine.
Remove the machine protections and the equipment
contained in the package. Take the machine out.
If there is an external motor pump, the motor and the
pump are provided in a separate package.
!
Handling operations must be performed by at
least 2 persons or with the aid of suitable lifting
accessories.
!
Considering the significant weight of the
equipment, use extreme caution in handling and
use safety gloves.
i
All technical data are indicated on the technical
data plate.
The detais of the equipment are also reported on
the label located on the packaging of the machine.
E
R
O
A
D
F
P
M
M
A
E
S
T
V
P
E
R
U
A
V
A
P
A
U
C
A
W
Q
A
S
E
S
E
R
W
A
T
U
E
A
5
2
2

Table of Contents

Other manuals for Wega Mininova

Related product manuals