High Torque Rotary Unit • ST0055 - ST0140 • R04-2014
26/42
Installation
5.1 Safety during installation
5
5 Installation
5.1 Safety during installation
5.2 Installation prerequisites
Check prior to installation whether the dimensions of the installation site and building
conditions correspond to the necessary prerequisites and measurement specification in
the drawing documents.
Particularly ensure that:
• The supporting floor is level and rigid.
• The dimensions of the supporting structure at the installation location must be suf-
ficient to withstand the dynamic forces that occur.
5.2.1 Installation preparation
• Open the packaging unit prior to the assembly and remove the machine from the
packaging unit.
• The customer's bores must be made based on the hole pattern in Chapter 3.3.6.
• The attachment screws must be at hand.
5.2.2 Operating media / Auxiliary media / Tools
The following are required for installation of the machine:
• One set of spanners
• One torque wrench
• One set of screwdrivers
• Screw securing agent (e.g. Loctite ® 243)
• Screws which are at least have a property class of 8.8
WARNING
Injuries caused by incorrect installation.
The dimensions of the supporting ground and fastening equipment must sufficient, so that
they can withstand the stresses produced during operation.
Auxiliary personnel may only perform work which is assigned to them by plant techni-
cians.
Create a proper electrical grounding.