High Torque Rotary Unit • ST0055 - ST0140 • R04-2014
29/42
Commissioning
6.2 Initial commissioning
6
6.2 Initial commissioning
If the machine is delivered with servo drive and software, the start-up is conducted via
the Weiss Application software WAS.handling Windows programme.
More information is also contained in the operating manual WAS.indexer Control
ST0055 - ST0140 .
6.3 Recommissioning
Risk of injury emanating from an operationally unsafe machine.
An operationally unsafe machine can cause injuries and material damage. Recommis-
sioning should only be realised after it has been ascertained that the machine is in a
functionally reliable condition and no risk emanates from it during operation.
A visual inspection of the machine should be conducted prior to re-commissioning. The
following should be checked and ensured in this regard:
No damage is present on the machine.
No foreign materials, tools or other objects are lying in the operating area of the
machine.
All supply units are connected and operating.
Safety equipment is ready for operation.