18
3062878_201707
9. Operating level 1
STANDARD SETTING
7-day program active
GE-18
DISPLAYSELECTIONEsc BACK
Pressing the button highlights the operating mode, which can then be adjusted
with the
buttons.
Please note
The 7-day program is activated at the factory.
STANDARD SETTING
Backup mode,
heating active
(YES)
GE-19
DISPLAYSELECTIONEsc BACK
Enabling / disabling
backup mode, heating
Pressing enables the backup mode, heating to be enabled or, by pressing again,
to be disabled. For adjustment options and changes, see chapter Backup mode.
(Prerequisite: room temperature sensor available)
STANDARD SETTING
(YES)
GE-20
DISPLAYSELECTIONEsc BACK
Backup mode,
cooling active
Enabling / disabling
backup mode, cooling
Pressing enables the backup mode, cooling to be enabled or, by pressing again,
to be disabled. For adjustment options and changes, see chapter Backup mode.
(Prerequisite: room temperature sensor available)
Pressing
highlights the set humidity level that can then be changed with .
Finallyconrmtheselectedvaluewith .
Set humidity level
GE-16
DISPLAYSELECTIONEsc BACK
STANDARD SETTING
Set value, vent air rh
50 % r.h.
Pressing highlightstheowratethatcanthenbechangedwith .
Finallyconrmtheselectedvaluewith .
Forventilationsystems,theowratesforsupplyandextractairforexternaldemand
are changed separately.
Flow rate for external demand
GE-14
DISPLAYSELECTIONEsc BACK
STANDARD SETTING
Flow rate, vent. air for
external demand
Stage 3: 2000 m³/h
Stage 2: 1500 m³/h
Stage 1: 1000 m³/h
7-day program operating mode
STANDARD SETTING
Automatic start via external demand
(YES)
GE-30
DISPLAYSELECTIONEsc BACK
Automatic start via external
demand
Pressing enablesthefunctionalityoftheexternalstagedemandtobedened.If
this parameter is set to "Yes", the system will start even if a demand falls outside the
perioddenedbythe7-dayprogram.
If this parameter is set to "No", the stage demand only becomes active during the
operating hours.