Manual 37941A DTSC-200A - ATS Controller - Operation
Page 8/37 © Woodward
22
Push Button LOAD TEST
With this button the operator can manually initiate the LOAD TEST sequence. Once pushed he
must confirm over display whether he want to start the LOAD TEST with all its consequences.
NOTE
Initiating a LOAD TEST can cause a dead bus during switching the ATS control.
Confirming
No Confirming
With confirming over the return button, the manually LOAD TEST is initiated and the LED
LOAD TEST
18
will flashing.
If the LED LOAD TEST
18
is flashing the operator can abort the LOAD TEST by pushing the
LOAD TEST button again. With doing that he must confirm again to interrupt the LOAD TEST.
Confirming
No Confirming
If he confirms the abort of the load test the LED LOAD TEST
18
will be off and the DTSC-
200A goes into the normal operation.