12.7 Gas boiler system commissioning checklist
This Commissioning checklist is to be completed in full by the competent person who commissioned the appliance as a means of demonstrating compliance
with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This
does not affect the customer’s statutory rights.
Customer name: Telephone number:
Address:
Boiler make and model
Boiler serial number:
Commissioned by (PRINT NAME): Gas Safe register number:
Company name: Telephone number:
Company address:
Commissioning date:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
Building Regulations Notification Number (if applicable):
Controls: Tick the appropriate boxes
Time and temperature control to heating Room thermostat and programmer/timer Programmable room thermostat
Load/Weather compensation Optimum start control
Time and temperature control hot water Cylinder thermostat and programmer/timer Combination boiler
Heating zone valves Fitted Not required
Hot water zone valves Fitted Not required
Thermostatic radiator valves Fitted Not required
Automatic by-pass valve fitted to system Fitted Not required
Boiler interlock Provided
All Systems
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions Yes
What system cleaner was used?
What inhibitor was used? Quantity litres
Has a primary water system filter been installed? Yes No
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 Yes
CENTRAL HEATING MODE measure and record
Gas rate m
3
/hr OR ft
3
/hr
Burner operating pressure (if applicable) mbar OR Gas inlet pressure mbar
Central heating temperatures Flow temperature °C Return temperature °C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)? Yes No
If yes, and if required by the manufacturer, has a water scale reducer been fitted? Yes No
What type of scale reducer has been fitted?
HOT WATER MODE measure and record
Gas rate m
3
/hr OR ft
3
/hr
Burner operating pressure (if applicable) mbar OR Gas inlet pressure mbar
Cold water inlet temperature °C
Hot water has been checked at all outlets Yes Temperature °C
Water flow rate l/min
All INSTALLATIONS - Record the following:
Flue integrity check: Pass At max. rate: CO ppm AND CO/CO
2
Ratio
Fail At max. rate: (where possible) CO ppm AND CO/CO
2
Ratio
The heating and hot water system complies with the appropriate Building Regulations Yes
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Yes
The operation of the boiler and system controls have been demonstrated to and understood by the customer Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through
a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
www.centralheating.co.uk