6A-3
Outboard Rigging Guide - 2001
INSTALLATION
1. Install:
• Tiller handle ass’y 1
• Nuts 2
2. Install:
• Grommet 1
• Engine stop switch connectors 2
3. Install:
• Cable stopper 1
• Rubber seal 2
• Remote control cables 3
4. Install:
• Fitting plate 1
• Bolts 2
5. Adjust:
• Shift cable joint position
Adjustment steps:
• Turn the shift handle 1 in neutral pos-
tion.
Nut:
38 Nm (3.8 m•kg, 27 ft•lb)
Bolt:
10 Nm (1.0 m•kg, 7.2 ft•lb)