EasyManua.ls Logo

Yamaha F80 - Page 367

Yamaha F80
497 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-6
Outboard Rigging Guide - 2001 9.9/15 (2-Stroke) Remote Control Attach. Kit
3. Install:
• Bushing
• Shift Lever
• Screw
4. Install:
• Cable Clamp 4
• Spring Pin 5
• Remote Control Bracket 3
• Bolt 6
• Nut 7
Clamp Bracket Bolt
1. Replace:
• Clamp Bracket Bolt
Remote Control Cable
1. Install:
• Cable End 8
2. Connect:
• Shift Cable a
• Throttle Cable b
• Cable End 8
• Plane Washer
• Clip 9
Screw Tightening Torque:
3.5 Nm (0.35 m•kg)
15
11
12
16
17
16
17
21
4
22
20
5
3
7
18
6
14
13
12
19
242
22
20
21
21
Bolt
66
Tightening Torque:
8 Nm (0.8 m•kg)
23
Nut
aa
Tightening Torque:
13 Nm (1.3 m•kg)
a
23
8
18
10
9
8
9
8
20
3
b
10

Table of Contents