ENGINE
3-7
g. Install the exhaust and intake camshafts, tim-
ing chain and camshaft caps.
IP
• Refer to “CAMSHAFTS” on page 5-9.
• Lubricate the camshaft lobes and camshaft
journals.
• Turn the crankshaft clockwise several full turns
to seat the parts.
h. Measure the valve clearance again.
i. If the valve clearance is still out of specifica-
tion, repeat all of the valve clearance adjust-
ment steps until the specified clearance is
obtained.
▲▲▲▲ ▲ ▲▲▲▲▲▲▲▲▲ ▲ ▲▲▲▲ ▲ ▲▲▲▲ ▲ ▲▲▲▲▲▲▲
6. Install:
• All removed parts
IP
For installation, reverse the removal procedure.
EAS20571
SYNCHRONIZING THE THROTTLE BODIES
IP
Before synchronizing the throttle bodies, check
the following items:
• Valve clearance
• Spark plugs
• Air filter element
• Throttle body joints
• Fuel hoses
• Air induction system
• Exhaust system
• Canister purge hoses (for California only)
• Breather hoses
Checking the throttle body synchronization
1. Stand the vehicle on a level surface.
IP
Place the vehicle on a suitable stand.
2. Remove:
• Caps “1”
3. Install:
• Vacuum gauge “1”
• Digital tachometer
4. Check:
• Throttle body synchronization
T
R
.
.
Camshaft cap bolt
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
2
1
A. Left side
B. Right side
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
A
1
1
B
1
1
1