Transportation
3 - 15
3.1.1 Using a crane
Adequate load handling devices must be used to transport the robot. Make sure that the
robot is lifted as shown in the diagram "Transport by crane".
The robot is equipped with transport securing devices and shipping bolts to reduce external
forces to a minimum during transport
Using a crane
Position of the center of grav-
ity
Wire rope (length: 2000 mm
or longer)
Shipping brackets and bolts
1
1. Must be mounted prior to transportation.
8 screws M20 x 70
1
, 8 spring
washers M20
1
15391102
1610
2
3
4