EasyManua.ls Logo

YASKAWA MH5S II - Page 45

YASKAWA MH5S II
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and inspection
9 - 45
1 Trained staff
2 YASKAWA trained staff
3 YASKAWA staff
Inspection intervals
Item numbers
1
Schedule (h) Checking method Operation Inspection
Charge:
Daily
1000
6000
12000
24000
36000
12 3
1 Alignment marks Visual inspection Check alignment mark accor-
dance and damage at the
home position.

2 Working area and robot Visual inspection Dirty working area has to be
cleaned. Please control the
robot for damage and external
cracks.

3 Fastening bolts of baseplate Using correspond-
ing tool
Tighten loose screws (replace
if necessary).

4 Fastening bolts of cover Using correspond-
ing tool
Tighten loose screws (replace
if necessary).

5 Terminal strip Manual Check for loose connectors 
6 Cleaning the wire harness in the robot working
area
Visual, multimeter Check for conduction between
the main connector of base
and intermediate connector
with manually shaking the
wire. Check the protection
spring
2
.

Replace
3

Table of Contents

Related product manuals