EasyManua.ls Logo

Zebra TC21 - Page 167

Zebra TC21
205 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
fAccessories
167
4.
Hang the bracket on the screws.
5. Install two top screws.
6. Tighten all screws.
7. Assemble the four 4-Slot Battery Chargers or cradle onto the bracket. See steps 7 through 11 on
page 161.
8. Route cables and connect to power source.
CAUTION: Installer should ensure that all building codes are followed when connecting the power supplies
to an AC power source.
While installing the brackets, power supplies and cables:
Use tie wraps to secure cables to the bracket and rails.
Coil cables wherever possible.
Route power cables along the rails.
Route inter-cradle cables to the side rails and then from the rails to the bracket.

Table of Contents

Other manuals for Zebra TC21

Related product manuals