EasyManua.ls Logo

Aastra MX-ONE - Installation Preparation; Tools

Aastra MX-ONE
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Preparation
3 Installation Preparation
The site is prepared mostly during the site planning stage, as described in the
environmental spec for MX-ONE SITE PLANNING. Should these preparations
not be complete, perform the following steps before starting the installation:
1. Mark where to position the equipment and where to mount wall supports
(if required).
2. Drill holes for anchoring the rack to the floor (use the rack and the tip
protection as a template).
3. If necessary, make holes for the running of cables between rooms.
4. If required, set up cable chutes in the site.
5. Clean the room before unpacking the equipment.
3.1 Tools
The following tools are required for hardware installation in a BYB 501 cabinet:
Table 5 Tools
Tool Product Number Dimensions Used for
Set of tools LTT 999 08/1
U-Ring wrench LSB 116 24 W = 24 mm Tip protection and
cabinet feet
U-Ring wrench LSB 116 13 W = 13 mm Battery pole nuts
Torx T30 screwdriver LSA 126 11/30 Door set
Torx T20 screwdriver LSA 126 11/20 ESD-cover, air
plates
Torx T8 screwdriver LSA 126 11/8 Air plates, board
fronts, and cable
connectors
Hexagon key set LSB 904 21
45 x 14 x 1.5
mm
Door set
Slotted screwdriver 3x0.5 LSA 1001/2
161 x 3 x 0.5
mm
For connection of
AC/DC unit
PH2 screwdriver (Philips2) LSA 122 12/2 L = 200 mm For earthing of
AC/DC unit
216/1531-ASP 113 01 Uen J2 2008-07-17

Table of Contents

Related product manuals