04-3275_OPM_ABB_CONCEPTPOWER_DPA_500kW_EN_REV-A.docx Page 13/78 ABB
Modifications reserved
3.3 UNPACKING
Prior unpacking make sure that the floor surface is solid and suitable for supporting the weight of all the equipment.
The UPS and accessories are delivered on a specifically designed pallet that allowing to move it with a forklift or a
pallet jack. Bring the unit(s) close to the end position and unpack them by removing the packing and shipping
materials as described next.
WARNING
UPS AND BATTERY CABINETS ARE HEAVY AND TALL. MAKE SURE YOU ARE ALWAYS
WORKING SAFELY BY USING APPROPIRATE TOOLS AND EQUIPMENT. WHEN MOVING
THE UNITS AROUND USING FORKLIFT, ALWAYS MAKE SURE THE UNITS ARE IN
UPRIGHT POSITION AND MOVE WITH SLOW SPEED AND SLOW ACCELERATIONS.
WHEN MOVING THE EQUIPMENT ALWAYS REFER TO THE CENTER OF GRAVITY (COG)
LABEL. WHICH MAY NOT BE IN ALWAYS IN THE MIDDLE (SEE FIGURE ON THE LEFT).
DPA 500 EQUIPPED WITH 1-2 MODULES HAVE THE COG IN THE MIDDLE OR CLOSE TO
IT, WHEREAS A DPA 500 WITH 3-5 MODULES HAS THE SHIFTED TO THE SIDE.
Perform the following steps to unpack the UPS equipment from the standard packaging:
1) and 2) Using a forklift load the unit by paying attention to the COG (see the warning above) and bring the unit(s)
close to the end position.
3) Remove the plastic film from the UPS, by cutting it on one edge (where there is the cardboard underneath).
Remove the 4x cardboard edges carefully by paying attention that the accessory box placed on top of the UPS
does not fall down. Lower the accessory box with the help of a stool or ladder; make sure you remain safe.
4) After having placed the UPS in its final position, disassemble the left and right dedicated transportation socket.
5) You may want to keep all packaging materials for later use.
1) 2)